dgj075 Gstad electrical sub-station, Zollikon, CH , 2007

 

This infrastructural building is located in a residential area in Zollikon, southeast of Zurich. The building is integrated into the landscape without interrupting the view from the square above onto Lake Zurich. A façade folded into the hill and wrapped around the delivery entrance disguises the real shape and size of the power supply installations for 2000 households.

project period 01/2006 - 07/2007
useInfrastructure
floor area 150 m²
building volume 600 m³
budget 1.4 Mio. CHF
client Zollikon Comunal Services
commissionDirect Comission, Study
project status: built work